Croft Structural + Civil help construct a 4 storey apartmentblock over the Leigham court Tunnel.  18.5mtrusses designed for long term creep, Spanned over the tunnel, and were supportedof isolated piles 25m deep.

Nigh time survey conducted.  During planned closures surveys workundertaken of the tunnel to records the condition.  Working with TfL and their closure programhelps reduce costs and work in hand with TfL and for our client.

Temporary works design was provided and Form 3’s completed. Croft provided the global design approach with loadings on the tunnels. Cranage loads on the tunnel were calcualted .