New buildings can suffer from defects. The corroded section on a swimming pool stairs was found on Christmas Eve. Due to the severity a Chartered Engineer visited on Christmas Eve. The hole through the primary steel support covered a third of the diameter of the tube. The decision was made to close the stairs for public safety.

Croft Structural Engineers had concerns that other areas may also be corroding and that the steelwork might have been from a defective batch. Testing was undertaken in the form of;

Croft gave the client the steelwork design required. Also out of our list of contractors we recommended someone suitable who undertook the work.