An early Victorian property was renovated. A new basement was formed under the building. The basement was to have open sides to the small garden. Steel frames were inserted under the building. The floors were strengthened. External walls were suffering from age, but the skills of the engineers at Croft allow them to be strengthened and their life extended.
|
![]() ![]()
|
|
A substantial property in one of St Johns Wood most prestigious areas required modernisation and refurbishment. A new extension was added to the side. The extension to the rear had lovely glass walls and roof to allow the setting sun to flood in. Internal the ground floor was opened up to allow for the modern living that families now so require.
|
![]() |
|
Design & build contract of 9
new flats above existing shops for a private client. The most
difficult item of this project was to keep the bakery open and operating on the
ground floor while the works were completed upstairs.
To do this the existing structure had to remain on the ground floor. To space transfer the loads around the property a concrete ring beam was cast on the first floor from which the upper floors were built. the whole project was completed with the bakery not loosing a days trade. |
![]()
|
| The British Dental Association required a conversion of their 1960's offices. The works were phased over several years, and coordinated by Burke Hunter Adams project managers with ORMS acting as architects. Total Contract Value £1.4M. |
![]() |
|
Freeland Rd, E5, by Private Developer Traditional contract to provide alteration of a Hotel into 9Nos 2-3bedroom apartments.Croft was called in when the initial structural engineer could not prove the stability of the new structure to the local district survey. With the in-house experience the project was proved and final construction costs were reduced, by close working with the contractor and Architect in a tight design team. Total Contract Value £780K |
![]() |
|
A private developer had acquired an old Victorian terrace in particularly poor condition. Trees were growing from the brick work at first floor. Croft Structural Engineers completed the initial pre purchase surveys and then progressive the specification with remedial repair works. Sections of the building required completed demolition and rebuilding. |
![]() |
![]()
![]() |
|
![]() |
|